SKE Industries has supplied a complete iron ore ship unloading and truck loading system to the Hongchang Port in China. The iron ore loading capacity can reach up to 1200TPH. The design allows for loading of two vehicles simultaneously, with quantitative loading achieved through a weighing system.
Our Scope
- Fixed hopper with spray dust removal system
- Belt conveyor
- Telescopic loading chute
- Unloading platform
- Belt scale
- Monitoring system
- Electrical system
- Commissioning and staff training
- One-year accessories
Features
- Meet environmental protection requirements
- The silo spray system can effectively suppress dust
- It has a belt quantitative weighing system
- Two vehicles can be loaded at the same time
- During the loading process, there is no spillage around the vehicle
- The feeding is uniform, which greatly increases the service life of the vehicle
- Two additional loading drivers are required on duty
Benefits
- Five-year gross profit of a single system:
An average of one car every 2 minutes, calculated at 280 yuan per car, 300 days a year, 16 hours of loading per day, a total of 480 cars loaded, 5-year benefits:
280X480X300X5=¥201.6 Million Yuan
(280/7.1)X480X300X5=USD28.4 Million
- The investment cost of a single conveying system is about 2.4 million yuan (USD0.339 Million).
- The five-year maintenance cost of a single conveying system is estimated to be 800,000 yuan (USD112,376).
- The five-year power consumption of a single system conveyor: single system power: 104kw, based on 16 hours a day:
5X300X16X104X0.65=¥162 Million (USD22.8 Million).
- The five-year labor cost of a single system loading driver: calculated based on two shifts of 4 people 4X5X12X8000=¥1.92 million (USD0.27 Million).
- Five-year comparison of gross profit:
20160-240-80-162-192=¥194.86 million (USD27.44 Million).